<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>CityCyclingEdinburgh Forum &#187; Topic: QR8 improvements consultation</title>
<link>http://citycyclingedinburgh.info/bbpress/</link>
<description>CityCyclingEdinburgh Forum &#187; Topic: QR8 improvements consultation</description>
<language>en</language>
<pubDate>Tue, 19 May 2026 12:39:29 +0000</pubDate>

<item>
<title>Murun Buchstansangur on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-316231</link>
<pubDate>Wed, 23 Oct 2019 15:02:12 +0000</pubDate>
<dc:creator>Murun Buchstansangur</dc:creator>
<guid isPermaLink="false">316231@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;I don't see how bollards are going to help with making peds and cyclists look both ways for trams before crossing. Indeed, for cyclists, they'll be a near-field distraction to navigate.
&#60;/p&#62;</description>
</item>
<item>
<title>chrisfl on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-316223</link>
<pubDate>Wed, 23 Oct 2019 14:09:55 +0000</pubDate>
<dc:creator>chrisfl</dc:creator>
<guid isPermaLink="false">316223@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;and it looks like they're going ahead with installing the bollards.
&#60;/p&#62;</description>
</item>
<item>
<title>Frenchy on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-315412</link>
<pubDate>Tue, 08 Oct 2019 10:08:26 +0000</pubDate>
<dc:creator>Frenchy</dc:creator>
<guid isPermaLink="false">315412@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;If only there were some sort of national standard for such gaps.&#60;/p&#62;
&#60;p&#62;Say, on page 77 of a document called &#60;a href=&#34;https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf&#34;&#62;&#60;em&#62;Cycling by Design&#60;/em&#62;.&#60;/a&#62;
&#60;/p&#62;</description>
</item>
<item>
<title>chrisfl on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-315410</link>
<pubDate>Tue, 08 Oct 2019 09:54:11 +0000</pubDate>
<dc:creator>chrisfl</dc:creator>
<guid isPermaLink="false">315410@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Did some measuring this morning, the gap between the central bollard and the side bollards varies massivly, as large as 1m90 one side of the tram at Edinburgh Park and then 90cm the other and 1m29, 1m25, 1m8cm and 1m02 at the crossing before Edinburgh Park station.&#60;/p&#62;
&#60;p&#62;I also measured a gap at the side to the bollard of 69cm at Edinburgh Park. &#60;/p&#62;
&#60;p&#62;I think some of these will be difficult on a normal bike let alone a Cargo Bike or Tandem.
&#60;/p&#62;</description>
</item>
<item>
<title>HankChief on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-315245</link>
<pubDate>Fri, 04 Oct 2019 20:52:11 +0000</pubDate>
<dc:creator>HankChief</dc:creator>
<guid isPermaLink="false">315245@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;I get why they are doing 'something' but ai don't see why they are bollarding it to the point of unusability
&#60;/p&#62;</description>
</item>
<item>
<title>CycleAlex on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-315235</link>
<pubDate>Fri, 04 Oct 2019 19:35:14 +0000</pubDate>
<dc:creator>CycleAlex</dc:creator>
<guid isPermaLink="false">315235@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The RAIB highlighted a lack of barriers to force people to change direction when approaching tramway crossings in their report on the person that sadly died nearby. I imagine this is a response to that
&#60;/p&#62;</description>
</item>
<item>
<title>HankChief on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038&amp;page=2#post-315233</link>
<pubDate>Fri, 04 Oct 2019 19:29:18 +0000</pubDate>
<dc:creator>HankChief</dc:creator>
<guid isPermaLink="false">315233@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The tramway crossings have been marked out as a bollard hot spot and a no go route for cargo/long bikes  :-(&#60;/p&#62;
&#60;p&#62;Cllr Mcinnes has been appealed to, to prevent the change, but appears to be Edinburgh Trams doing...&#60;/p&#62;
&#60;p&#62;&#60;a href=&#34;https://twitter.com/PeterTBBrett/status/1180037131684794368?s=19&#34; rel=&#34;nofollow&#34;&#62;https://twitter.com/PeterTBBrett/status/1180037131684794368?s=19&#60;/a&#62;
&#60;/p&#62;</description>
</item>
<item>
<title>acsimpson on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-310781</link>
<pubDate>Tue, 16 Jul 2019 11:57:38 +0000</pubDate>
<dc:creator>acsimpson</dc:creator>
<guid isPermaLink="false">310781@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;@Paulmilne, I think legitimising customary behaviour justifies it. There is always a risk from a disgruntled driver who was annoyed by a cyclist using the pedestrian crossing.
&#60;/p&#62;</description>
</item>
<item>
<title>SRD on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-310292</link>
<pubDate>Mon, 08 Jul 2019 14:53:25 +0000</pubDate>
<dc:creator>SRD</dc:creator>
<guid isPermaLink="false">310292@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;and rationalising the scheme...
&#60;/p&#62;</description>
</item>
<item>
<title>paulmilne on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-310285</link>
<pubDate>Mon, 08 Jul 2019 13:37:43 +0000</pubDate>
<dc:creator>paulmilne</dc:creator>
<guid isPermaLink="false">310285@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Going by there every work day I can testify that the current crossing is pretty much used as a toucan without exception, so not sure what actual difference this will make, apart from legitimising customary behaviour.
&#60;/p&#62;</description>
</item>
<item>
<title>Stickman on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-310249</link>
<pubDate>Mon, 08 Jul 2019 09:07:29 +0000</pubDate>
<dc:creator>Stickman</dc:creator>
<guid isPermaLink="false">310249@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Work has started on upgrading the Balgreen crossing to a toucan. Expected to finish 19th July.
&#60;/p&#62;</description>
</item>
<item>
<title>CycleAlex on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-307137</link>
<pubDate>Mon, 20 May 2019 23:49:40 +0000</pubDate>
<dc:creator>CycleAlex</dc:creator>
<guid isPermaLink="false">307137@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Have the council given up on the toucan crossing at Balgreen Road? Seems like a relatively small change and yet two years later...
&#60;/p&#62;</description>
</item>
<item>
<title>Stickman on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283642</link>
<pubDate>Wed, 30 May 2018 16:05:23 +0000</pubDate>
<dc:creator>Stickman</dc:creator>
<guid isPermaLink="false">283642@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;@paulmilne - one of the buildings is used by the cricket clubs. &#60;/p&#62;
&#60;p&#62;Friends of Roseburn Park want to turn the smallest one into a cafe. If that happens then something will have to be done about a cycle route - maybe take part of the grassed area?
&#60;/p&#62;</description>
</item>
<item>
<title>paulmilne on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283641</link>
<pubDate>Wed, 30 May 2018 15:42:24 +0000</pubDate>
<dc:creator>paulmilne</dc:creator>
<guid isPermaLink="false">283641@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;@neddie, yes, I stand corrected.
&#60;/p&#62;</description>
</item>
<item>
<title>Rosie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283618</link>
<pubDate>Wed, 30 May 2018 13:20:23 +0000</pubDate>
<dc:creator>Rosie</dc:creator>
<guid isPermaLink="false">283618@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;@neddie - Yes.
&#60;/p&#62;</description>
</item>
<item>
<title>neddie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283617</link>
<pubDate>Wed, 30 May 2018 13:12:34 +0000</pubDate>
<dc:creator>neddie</dc:creator>
<guid isPermaLink="false">283617@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The safe lane along the A8 &#34;only&#34; has to get as far as Riversdale Cres to bypass the park, even if heading on to the Balgreen path, no?
&#60;/p&#62;</description>
</item>
<item>
<title>paulmilne on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283615</link>
<pubDate>Wed, 30 May 2018 13:07:18 +0000</pubDate>
<dc:creator>paulmilne</dc:creator>
<guid isPermaLink="false">283615@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;My problem with moving the commuters (me) out of the park onto the A8 even after the CCWEL is one of the wider network. I use the park to get to the access of the shared use path by the tramline via Balgreen Road. Even if I used the A8 post CCWEL I'd still have to get down the way to my destination (Saughton House). &#60;/p&#62;
&#60;p&#62;I do try to go at a reasonably slow speed through the park if there are other users, and take care weaving through the building. Are the buildings actually used for anything? Maybe they could be removed to improve  sightlines and reduce visual clutter for everyone.
&#60;/p&#62;</description>
</item>
<item>
<title>Rosie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283613</link>
<pubDate>Wed, 30 May 2018 12:07:18 +0000</pubDate>
<dc:creator>Rosie</dc:creator>
<guid isPermaLink="false">283613@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;@Stickman - I have the impression of people going too fast past the buildings as well. I hate tactiles anywhere but I think they are statutory on shared paths eg the tramway from Balgreen.  I would certainly agree about getting the commuters out &#38;amp; can see that being a logical development after the CCWEL is built, though of course the &#34;Community&#34; would hate it.  Certainly there's conflict in the Park, which should be for gentle leisure cycling, not commuting.  Would you have any suggestions about the layout, other than knocking down those buildings?
&#60;/p&#62;</description>
</item>
<item>
<title>Stickman on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-283610</link>
<pubDate>Wed, 30 May 2018 11:15:37 +0000</pubDate>
<dc:creator>Stickman</dc:creator>
<guid isPermaLink="false">283610@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Received a survey asking for views on the layout in Roseburn Park. I responded to say that I didn't think it was working (it encourages people to cycle faster past the buildings as they may assume no one is walking on the bike side, and that the tactiles were rubbish and I always try to avoid the ones on the bike side).  Also said that if they want to get fast cyclists (mostly commuters) out of the park then build a safe lane on the A8.
&#60;/p&#62;</description>
</item>
<item>
<title>Stickman on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-281238</link>
<pubDate>Fri, 27 Apr 2018 13:20:45 +0000</pubDate>
<dc:creator>Stickman</dc:creator>
<guid isPermaLink="false">281238@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The statutory notices for making the crossing at Balgreen a toucan have been stuck to the poles there.
&#60;/p&#62;</description>
</item>
<item>
<title>neddie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-273379</link>
<pubDate>Tue, 23 Jan 2018 14:01:23 +0000</pubDate>
<dc:creator>neddie</dc:creator>
<guid isPermaLink="false">273379@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The consultation appears to have been updated, but now only contains the upgrade of the Balgreen crossing to Toucan&#60;/p&#62;
&#60;p&#62;&#60;a href=&#34;https://consultationhub.edinburgh.gov.uk/sfc/cycle-walk-design-balgreen-rd-fd/consult_view/&#34; rel=&#34;nofollow&#34;&#62;https://consultationhub.edinburgh.gov.uk/sfc/cycle-walk-design-balgreen-rd-fd/consult_view/&#60;/a&#62;&#60;/p&#62;
&#60;p&#62;For reference, the original consultation is here: &#60;a href=&#34;https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-balgreen-road/&#34; rel=&#34;nofollow&#34;&#62;https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-balgreen-road/&#60;/a&#62;&#60;/p&#62;
&#60;p&#62;The earlier consultation dealt with many issues from the riverside, across Balgreen Road, Whitson Road and finishing on Stenhouse Drive near the point it meets the tram line.
&#60;/p&#62;</description>
</item>
<item>
<title>chdot on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-246660</link>
<pubDate>Wed, 12 Apr 2017 14:30:44 +0000</pubDate>
<dc:creator>chdot</dc:creator>
<guid isPermaLink="false">246660@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Does any or all of that represent and satisfy the views of anyone on here who commented?
&#60;/p&#62;</description>
</item>
<item>
<title>Klaxon on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-246644</link>
<pubDate>Wed, 12 Apr 2017 14:04:17 +0000</pubDate>
<dc:creator>Klaxon</dc:creator>
<guid isPermaLink="false">246644@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;&#60;strong&#62;&#60;a href=&#34;https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-bankhead/consult_view/&#34;&#62;Bankhead Drive, Bankhead Avenue and South Gyle Access&#60;/a&#62;&#60;/strong&#62;&#60;/p&#62;
&#60;p&#62;Changes to be included:&#60;br /&#62;
 We shall consider a continuous footway at Makro.&#60;br /&#62;
 Additional signage and ground markings shall be added along all new sections of shared&#60;br /&#62;
use pavement.&#60;br /&#62;
 The new proposed crossing, at the entrance to Forrester High School, shall be a toucan&#60;br /&#62;
crossing.&#60;br /&#62;
 A decluttering assessment of existing street furniture shall be undertaken.&#60;/p&#62;
&#60;p&#62;&#60;strong&#62;&#60;a href=&#34;https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-balgreen-road/consult_view/&#34;&#62;Balgreen Road&#60;/a&#62;&#60;/strong&#62;&#60;br /&#62;
Changes to be included:&#60;br /&#62;
 We shall change the design to bring the pavement entry/exit point on Baird Drive further&#60;br /&#62;
east, away from the junction. This will make it safer and easier for cyclists to join the&#60;br /&#62;
crossing from Baird Drive and rejoin the road (Baird Drive) from the pavement.&#60;br /&#62;
 We shall include dropped kerbs and shared use re-determination along the widened&#60;br /&#62;
section of pavement between Saughton Hall Drive and the crossing of Balgreen Road.&#60;br /&#62;
This shall provide the access that you have highlighted.&#60;/p&#62;
&#60;p&#62;&#60;strong&#62;&#60;a href=&#34;https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-roseburn-park/consult_view/&#34;&#62;Roseburn Park&#60;/a&#62;&#60;/strong&#62;&#60;br /&#62;
Changes to be included:&#60;br /&#62;
There are no changes that shall be made to the current proposals. However, this is a 3 month trial and&#60;br /&#62;
we shall evaluate its effectiveness and reopen the consultation for further feedback before proposing a&#60;br /&#62;
permanent solution.
&#60;/p&#62;</description>
</item>
<item>
<title>neddie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-243517</link>
<pubDate>Fri, 24 Feb 2017 11:17:25 +0000</pubDate>
<dc:creator>neddie</dc:creator>
<guid isPermaLink="false">243517@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;The Roseburn Park consultation closes on Sunday&#60;/p&#62;
&#60;p&#62;(Note: this is the reopened consultation - the previous consultation results have been lost)
&#60;/p&#62;</description>
</item>
<item>
<title>neddie on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-241528</link>
<pubDate>Wed, 25 Jan 2017 10:26:24 +0000</pubDate>
<dc:creator>neddie</dc:creator>
<guid isPermaLink="false">241528@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;This consultation has reopened, due to CEC losing the previous results, as mentioned by Rosie here:&#60;br /&#62;
&#60;a href=&#34;http://citycyclingedinburgh.info/bbpress/topic.php?id=17102&#38;amp;page=2#post-241291&#34; rel=&#34;nofollow&#34;&#62;http://citycyclingedinburgh.info/bbpress/topic.php?id=17102&#38;amp;page=2#post-241291&#60;/a&#62;&#60;/p&#62;
&#60;p&#62;ROSEBURN PARK CONSULTATION RE-OPENED&#60;br /&#62;
NOW FROM 20 JANUARY TO 26 FEBRUARY&#60;/p&#62;
&#60;p&#62;A copy of the leaflet is here:&#60;br /&#62;
&#60;a href=&#34;http://www.spokes.org.uk/wp-content/uploads/2013/12/1701-Roseburn-Park-second-consultation-public-leaflet.pdf&#34; rel=&#34;nofollow&#34;&#62;http://www.spokes.org.uk/wp-content/uploads/2013/12/1701-Roseburn-Park-second-consultation-public-leaflet.pdf&#60;/a&#62;
&#60;/p&#62;</description>
</item>
<item>
<title>chdot on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-234137</link>
<pubDate>Mon, 17 Oct 2016 13:56:14 +0000</pubDate>
<dc:creator>chdot</dc:creator>
<guid isPermaLink="false">234137@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Of course not so many 'fast commuters' would go through Roseburn Park  if there was a segregated cycle lane along the A8 - even just as far as Riversdale Crescent.&#60;/p&#62;
&#60;p&#62;Might have to start on Roseburn Terrace...
&#60;/p&#62;</description>
</item>
<item>
<title>steveo on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-234130</link>
<pubDate>Mon, 17 Oct 2016 13:27:17 +0000</pubDate>
<dc:creator>steveo</dc:creator>
<guid isPermaLink="false">234130@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;So &#34;official&#34; CCE response: &#34;Yawn, more of the same&#34;. &#34;Please stop wasting the money we fought hard to secure&#34;
&#60;/p&#62;</description>
</item>
<item>
<title>threefromleith on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-234127</link>
<pubDate>Mon, 17 Oct 2016 13:07:17 +0000</pubDate>
<dc:creator>threefromleith</dc:creator>
<guid isPermaLink="false">234127@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;They're finally moving the telecoms cabinets out of the centre of the cycle side of the shared path at South Gyle Access!  It's a bleedin' miracle!&#60;/p&#62;
&#60;p&#62;Sadly, I don't think much of the rest of 'improvements' around the 2-stage crossing with the central islands.  A proper improvement would be the creation of a cycling 'flyover' of the road there.
&#60;/p&#62;</description>
</item>
<item>
<title>Stickman on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-234122</link>
<pubDate>Mon, 17 Oct 2016 12:26:48 +0000</pubDate>
<dc:creator>Stickman</dc:creator>
<guid isPermaLink="false">234122@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;I don't think I've seen anyone dismount for the Balgreen Crossing. There is a nicely ambiguous sign on Baird Drive saying &#34;Cyclists use crossing&#34;. &#60;/p&#62;
&#60;p&#62;The Roseburn Park segregation seems a waste of time and money given the state the park is in just now and potential plans which will involve the rugby team building a pavilion/a cafe opening in the old toilet block/the block being demolished.
&#60;/p&#62;</description>
</item>
<item>
<title>Dave on "QR8 improvements consultation"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=17038#post-234121</link>
<pubDate>Mon, 17 Oct 2016 12:15:52 +0000</pubDate>
<dc:creator>Dave</dc:creator>
<guid isPermaLink="false">234121@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;LOL. Only in Edinburgh would we build a massive segregated cycle facility then forget the crossing at the end.
&#60;/p&#62;</description>
</item>

</channel>
</rss>
