<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>CityCyclingEdinburgh Forum &#187; Topic: Tram track work - Shandwick Place</title>
<link>http://citycyclingedinburgh.info/bbpress/</link>
<description>CityCyclingEdinburgh Forum &#187; Topic: Tram track work - Shandwick Place</description>
<language>en</language>
<pubDate>Tue, 19 May 2026 05:25:25 +0000</pubDate>

<item>
<title>chdot on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355267</link>
<pubDate>Sat, 02 Oct 2021 09:01:26 +0000</pubDate>
<dc:creator>chdot</dc:creator>
<guid isPermaLink="false">355267@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Ah&#60;/p&#62;
&#60;p&#62;&#60;a href=&#34;https://www.edinburghnews.scotsman.com/news/transport/crumbling-concrete-forces-repairs-to-133-sections-of-edinburghs-tram-line-3404775&#34; rel=&#34;nofollow&#34;&#62;https://www.edinburghnews.scotsman.com/news/transport/crumbling-concrete-forces-repairs-to-133-sections-of-edinburghs-tram-line-3404775&#60;/a&#62;&#60;/p&#62;
&#60;p&#62;“&#60;/p&#62;
&#60;p&#62;The company is completing the work at its own undisclosed expense after Edinburgh Trams said the firm had admitted liability for the faults, which were caused during construction.&#60;/p&#62;
&#60;p&#62;“&#60;/p&#62;
&#60;p&#62;CEC ‘lucky’ contractors hadn’t gone bust!
&#60;/p&#62;</description>
</item>
<item>
<title>LaidBack on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355177</link>
<pubDate>Thu, 30 Sep 2021 16:19:08 +0000</pubDate>
<dc:creator>LaidBack</dc:creator>
<guid isPermaLink="false">355177@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Aye... anyone doing expensive consultancy for transport projects should come here first! ;-)&#60;/p&#62;
&#60;p&#62;Range of expertise on all issues - we are a government in waiting!
&#60;/p&#62;</description>
</item>
<item>
<title>chdot on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355170</link>
<pubDate>Thu, 30 Sep 2021 13:46:39 +0000</pubDate>
<dc:creator>chdot</dc:creator>
<guid isPermaLink="false">355170@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;“but any tram work must take account of the weight and frequency here”&#60;/p&#62;
&#60;p&#62;Bit late. &#60;/p&#62;
&#60;p&#62;Should all have been factored in when track was planned and laid. &#60;/p&#62;
&#60;p&#62;Failures due to materials, installation processes and subsequent maintenance (or lack of) are no surprise. &#60;/p&#62;
&#60;p&#62;Will be ‘lucky’ if current remedial work is all that will be required due to specific localised conditions/circumstances.
&#60;/p&#62;</description>
</item>
<item>
<title>LaidBack on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355169</link>
<pubDate>Thu, 30 Sep 2021 13:36:44 +0000</pubDate>
<dc:creator>LaidBack</dc:creator>
<guid isPermaLink="false">355169@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;George IV Bridge no busier than usual from cycling perspective. Just a big line of cars and buses going nowhere fast. &#60;/p&#62;
&#60;p&#62;&#60;strong&#62;Question&#60;/strong&#62;&#60;/p&#62;
&#60;p&#62;E-buses are heavier than diesel models? Weight stays same too as they can't burn fuel to lighten?&#60;br /&#62;
The huge numbers of buses in city are very welcome for those without access to car but any tram work must take account of the weight and frequency here.
&#60;/p&#62;</description>
</item>
<item>
<title>mcairney on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355167</link>
<pubDate>Thu, 30 Sep 2021 10:36:00 +0000</pubDate>
<dc:creator>mcairney</dc:creator>
<guid isPermaLink="false">355167@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;Possibly a side effect of using platinum for the tracks? Corrosion-resistant but rather heavy (as well as expensive) ;-)
&#60;/p&#62;</description>
</item>
<item>
<title>chdot on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355159</link>
<pubDate>Thu, 30 Sep 2021 08:51:33 +0000</pubDate>
<dc:creator>chdot</dc:creator>
<guid isPermaLink="false">355159@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;“&#60;/p&#62;
&#60;p&#62;Further work is also being done on the two streets to replace life-expired “track sealant”.&#60;/p&#62;
&#60;p&#62;Three sources told The Scotsman the concrete cannot cope with being driven over by vehicles and is crumbling.&#60;/p&#62;
&#60;p&#62;‘Falling to bits’&#60;/p&#62;
&#60;p&#62;It is claimed this has been happening since shortly after the line was completed in 2014 and the wrong grade of material may have been used.&#60;/p&#62;
&#60;p&#62;“&#60;/p&#62;
&#60;p&#62;&#60;a href=&#34;https://www.edinburghnews.scotsman.com/news/transport/safety-repairs-underway-to-fix-edinburgh-trams-track-defects-3401598&#34; rel=&#34;nofollow&#34;&#62;https://www.edinburghnews.scotsman.com/news/transport/safety-repairs-underway-to-fix-edinburgh-trams-track-defects-3401598&#60;/a&#62;
&#60;/p&#62;</description>
</item>
<item>
<title>Tulyar on "Tram track work - Shandwick Place"</title>
<link>http://citycyclingedinburgh.info/bbpress/topic.php?id=20740#post-355108</link>
<pubDate>Wed, 29 Sep 2021 08:30:58 +0000</pubDate>
<dc:creator>Tulyar</dc:creator>
<guid isPermaLink="false">355108@http://citycyclingedinburgh.info/bbpress/</guid>
<description>&#60;p&#62;So what has happened here this week?&#60;/p&#62;
&#60;p&#62;&#60;a href=&#34;https://twitter.com/edintravel/status/1441362010738880514&#34; rel=&#34;nofollow&#34;&#62;https://twitter.com/edintravel/status/1441362010738880514&#60;/a&#62;&#60;/p&#62;
&#60;p&#62;A long term steel road plate Westbound at signal controlled crossing&#60;/p&#62;
&#60;p&#62;Some significant cracked sections of track slab, especially the 'joints' where the load-transfer bars delivered 2 cracks 30cm apart &#38;amp; concrete falling out - then patched with tarmac &#38;amp;c&#60;/p&#62;
&#60;p&#62;Look forward to pictures....
&#60;/p&#62;</description>
</item>

</channel>
</rss>
