According to the internet, the per mile cost for trams in UK cities was:
- Edinburgh: £76m (trams to Newhaven, 2.9 miles urban)
- Manchester: £103m (Trafford Park line, 3.4 miles urban)
- Nottingham: £73m (Phase 2 Clifton and Toton, 10.9 miles partly segregated)
- Birmingham: £128m (Westside extension to Edgbaston, 1.3 miles urban)
The internet also tells me that France can do it for half the cost:
- Nice: £96m (Tram Line 2, including a two mile tunnel and four underground stations)
- Montpelier: £54m (Line 5, 6.9 miles on wholly new permanent way)
- Bordeaux: £42m (Line D Eysines to Cantinolle, 6.1 miles)
- Strasbourg: £41m (Line F extension to Wolfisheim, 2.5 miles)
- Angers: £40m (Lines B and C, 6.3 miles)
Strasbourg's project cost includes all the street and walking and cycling works too. It would have been about £24m per mile if considering just the tram works.
It seems that the French have a way of thinking more holistically, and see trams as a fairly natural transport choice which is included when streets are constructed or reconstructed. France also has a more of a tram building habit, and transport authorities have much more autonomy to do these things, which in turn means specifications, design and procurement are more standardised. In the UK it's all done piecemeal, so there is discontinuity in the expertise for designing the schemes in the first place, and discontinuity in the supply chains once a project is green lit. And we're hamstrung by business cases, funding competitions, changes in scope, changes in approval, and PM expenditure even before we get around to laying any track.
So what about motorways? France wins at that too. For example, the UK's newest big project is the A14 between Cambridge and Huntingdon and is 21 miles long. As far as I can tell it's an online upgrade to D3, plus a viaduct and 34 other structures, and some land aquisition and modifications to local roads. The project cost is about £80m per mile according to National Highways.
A similar project in France is the A31 bis motorway, which is a bypass for Thionville and is about 5 miles long. In fairness, they have been wrangling over it for decades. It might be D2 or D3, depending which source you read. It was costed according to the terrain, so viaduct sections are about £65m/mile, and a cut-and-cover tunnel is about £130m/mile, but a 'simple' online widening from D2 to D3 is about £6m/mile. Overall, the project is likely to work out at £20 to £25m per mile.
I think the problem in the UK is that we just don't have a continuous programme of building anything, especially trams and motorways, so every new project starts from first principles and is essentially bespoke. And the long gaps between the intial design, gaining approval and actually starting to build anything mean we incur additional costs for redesigns, project management and the consultants to help us do that.