CityCyclingEdinburgh Forum » Cycling News
"We’re on the right path - but there’s a long way to go’ says CS boss"
(10 posts)-
Posted 9 years ago #
-
"We are on the right path but it doesn't go anywhere, fizzles out at major junctions and you keep having to dismount"
Posted 9 years ago # -
:D
"We are on the right path but it was designed by sustrans and goes round every house and looks like something you'd mountain bike on."
Posted 9 years ago # -
"We are on the right path, the one covered with leaf mulch, broken glass and signposts planted smack in the middle."
Posted 9 years ago # -
"We’re on the right path - but there’s a long way to go despite our destination being the shops at the end of the road."
Posted 9 years ago # -
"We are on the right path however the manoeuvres are tricky trying to dodge the chicanes, and parked cars blocking dropped kerbs whenever it crosses a road. Also pedalling is a bit tricky, what with the wounds sustained en route when an irate dog walker set his Doberman on us"
Posted 9 years ago # -
"We are on the right path but there's a chicane on it that's not wide enough to cycle through... but that's probably a good thing, as after the chicane, a car is parked on the path, blocking any way forward..."
Posted 9 years ago # -
We're on the right path, but maybe avoid it in the winter when it might be a bit muddy. Or Spring. Or Autumn. Wet days in summer might not be great either.
Posted 9 years ago # -
CS boss last seen going in the wrong direction with a determined look on his face.
Posted 9 years ago # -
But unfortunately paths are for foot traffic, when dealing with wheeled vehicles the design needs to have certain key features like forward visibility, radiussed corners, and smooth flowing routes without nuisance stopping.
Posted 9 years ago #
Reply
You must log in to post.