The WoL by Stedfastgate is currently being knackered by @EdinCore. There are plastic barriers, a trench at the bottom of a slope and they've made the path under the wee tunnel near St Mark's park even worse than it was.
CityCyclingEdinburgh Forum » Infrastructure
today's rubbish fibre-optic cable installation
(6 posts)-
Posted 10 years ago #
-
Edinburgh Core versus Water of Leith path by wingpig, on Flickr
Posted 10 years ago # -
Good grief what a mess!
Posted 10 years ago # -
Forgot to post about that after coming across it on Friday heading back from work to Leith.
Cycle path completely blocked off, with no warning and no alternative but to get off and lift the bike over the mucky verge you can see by the sign.
Are these works planned by clowns? It's a major cycling route and there's no consideration for cyclists (nor the disabled / infirm - I often see a disabled guy in his powered wheelchair near here, so don't know how he'll get safely past this).
Posted 10 years ago # -
The disabled guy has an electric mobility trike done up like a little Harley Davidson. Quite a cheery guy who'll be rather put out by these works.
Posted 10 years ago # -
Are these the same guys who have been lifting paving stones, setts and tarmac across the east New Town? We'll see how they settle, but I reckon a substantial number of new trip hazards have been installed along with the "ultra-fast pure fibre".
Posted 10 years ago #
Reply
You must log in to post.

posts
