CityCyclingEdinburgh Forum » Infrastructure

Leith Street

(22 posts)
  • Started 5 years ago by davecykl
  • Latest reply from CycleAlex

No tags yet.


  1. davecykl
    Member

    I'm just thinking…

    If this (not excessively disruptive) arrangement of the bus routes can work for a few weeks this month, why couldn't it work as an alternative for them using Leith Street permanently?

    https://www.lothianbuses.com/live-travel-info/service-update/?alert_id=2463c8ec010306fdd8bca458a491c336

    The next step is hopefully obvious. Even if motor vehicle access were to be restricted to just one direction, that would leave enough space for a proper uphill cycleway.

    Posted 5 years ago #
  2. chdot
    Admin

    Posted 5 years ago #
  3. davecykl
    Member

    Hehe, @chdot, you must have been at Picardy Place around the same time as me today!

    I was just thinking that now that the cycleway seems to be near enough finished, and that the steep slog up from the London Road roundabout is now reduced to one lane, the council really should open the cycleway in the uphill direction. I don't know how long the road has been reduced to just one lane since, but it really can't be fun cycling up there now with other traffic behind you and no way for it to pass you safely.

    (Re: my first post, what I meant was that if the buses were functioning perfectly well diverted from Leith Street recently, that would give scope for closing the street to motor traffic uphill beyond Calton Road and give us space for the cycleway that we need right up to North Bridge, not just the 3/4 of the way that has been built.)

    Posted 5 years ago #
  4. CycleAlex
    Member

    Also featured in those shots are the worlds most ignored no right turn signs!

    Is the Leith Stret cycleway still affected by the RSO hearing malarkey?

    Posted 5 years ago #
  5. chdot
    Admin

    “you must have been at Picardy Place around the same time as me today!”

    Nope, yesterday.

    Posted 5 years ago #
  6. dessert rat
    Member

    Pedaled up Leith St today around 3 with miniMcR in child seat. Took the single lane all the way up, was hideous.

    Counting the days until it'll be removed in 2029.

    Posted 5 years ago #
  7. chdot
    Admin

    “Counting the days until it'll be removed in 2029“

    Optimist.

    Posted 5 years ago #
  8. chdot
    Admin

  9. Frenchy
    Member

    Went through this earlier, it is some redd up at the moment.

    Posted 5 years ago #
  10. chdot
    Admin

    Posted 5 years ago #
  11. EdinburghCycleCam
    Member

    Leith Street was back open again when I went up it at 19:20 this evening.

    Interestingly, the 3 "No right turn" signs are back at the Picardy Place Roundabout - they were removed while Leith Street was closed.

    Posted 5 years ago #
  12. CycleAlex
    Member

    They haven't built out the cones again so it had the usual level of obedience.

    Posted 5 years ago #
  13. chdot
    Admin

    Posted 5 years ago #
  14. LaidBack
    Member

    Dedicated pram way?
    Assume it's not open yet but will experience a mix of uses whe it is.

    Posted 5 years ago #
  15. wingpig
    Member

    Were you just in front of the parked coach?

    Posted 5 years ago #
  16. chdot
    Admin

    Random photo off Flickr

    Newcastle

    Looks like nice wide path with some degree of priority over sidestreet.

    Oh, and some barriers...

    https://www.flickr.com/photos/chris_baines/48101309326/

    Posted 5 years ago #
  17. neddie
    Member

    That “priority over side street” is the typical badly implemented UK version. It still intuitively looks like the road has priority.

    Instead, the cycleway surface should be continuous, as should the footway. The entrance ramps should be steeper and the bend radii far tighter. The yellow lines should not cut across the cycle-/ footway

    Posted 5 years ago #
  18. chdot
    Admin

    Posted 5 years ago #
  19. CycleAlex
    Member

    Does anyone know if there’s newer plans for Picardy Place than these ‘final’ designs? Noticed there’s a one way cycle crossing between the North Eastern ped crossing and ASL that isn’t shown here. http://www.edinburgh.gov.uk/news/article/2476/final_road_layout_agreed_for_picardy_place_as_enabling_works_continue

    Posted 5 years ago #
  20. Frenchy
    Member

  21. CycleAlex
    Member

    Perfect, thanks!

    Posted 5 years ago #
  22. CycleAlex
    Member

    MMW, George IV Bridge, The Mound and George Street are all chaotic with pedestrians today. Perfect practice for the Leith Street cycleway!

    Posted 5 years ago #

RSS feed for this topic

Reply

You must log in to post.


Video embedded using Easy Video Embed plugin