  2. dessert rat
    Member

    local social media / curtain twitches are reporting that there's an application to close if for 2 years in the works - not sure I believe, but would be depressing if true - as a family we use this short link more than once / day and the alt routes are poor.

    Posted 9 months ago #
  3. wingpig
    Member

    When the consultation for this development was out years ago I questioned the need for the zone to include the north end of the path and was worried that it would end up with a load of placemaking hazards in the way. I do not recall any mention of any risk of it being shut for ages during development.

    Posted 9 months ago #
  4. neddie
    Member

    I once again iterated the importance of either minimising closure of the path itself, or opening a better diversion due to concerns about the length of diversion and suitability of the currently posted route for wheelchair users, prams, and cyclists as well as the impact on a nearby business.

    He confirmed that the team onsite are assessing options on the next door site (where the Stables are) to see if a parallel path is possible but was clear this was being explored so couldn’t be confirmed at this moment due to both health-and-safety considerations and liaison with the leads on that site

    https://www.broughtonspurtle.org.uk/news/st-marks-path-closure-latest-news

    Posted 9 months ago #
  5. chdot
    Admin

    After a community campaign, St Mark's Path will reopen today.

    According to The Edinburgh Minute Weekend edition: 19 - 21 December 2025

    https://www.edinburghminute.com/the-edinburgh-minute-weekend-edition-19-21-december-2025/

    Posted 8 months ago #
  6. gembo
    Member

    Maybe i divert that way then?

    Posted 8 months ago #
  7. chdot
    Admin

    And again (for different reasons)

    Full report -

    https://www.broughtonspurtle.org.uk/news/powderhall-bridge-closed

    Posted 1 month ago #
  8. chdot
    Admin

    (Yesterday)

    So

    Reinspected and declared safe?

    Didn’t mention before, but when the last Critical Mass went to St. Mark’s Park, there was a guy hanging about who said he was the engineer who had inspected the bridge and said it was unsafe and STRONGLY said that 100 bikes weren’t ‘allowed’ to cross the bridge

    CM organisers had already decided to alter route out of Park

    Posted 1 month ago #
  9. gembo
    Member

    Reinspected and things settled or reinspected after actual repair

    The bridge on the WoL path at the one hole golf course is closed. But this closure is ignored

    Posted 1 month ago #
  10. chdot
    Admin

    “reinspected after actual repair”

    Well suggestion was ’serious structural issues’ so assume not…

    Posted 1 month ago #
  11. bakky
    Member

    I'd say it's notable the barrier is still there (right of photo). If this was officially open again, they'd have removed the barrier from site?

    Posted 1 month ago #
  12. wingpig
    Member

    Does that bollard come out and to the wee vans which empty bins ever go across it?

    Posted 1 month ago #
  13. chdot
    Admin

  14. chdot
    Admin

  15. Yodhrin
    Member

    They could have the existing bridge knocked down and a temporary Bailey bridge in place inside a week while they look for a longer term solution, but I suspect nobody at the council is in any great hurry to do anything since they didn't want St Marks Path open during the construction on the adjacent site anyway and only reopened it on sufferance. Won't be surprised if, miraculously, any timescale they come up with for getting it sorted out will just so happen to coincide with the end of said construction works.

    Posted 1 month ago #
  16. chdot
    Admin

    “will just so happen to coincide with the end of said construction works”

    Well

    ‘Good’ news is that that may not be as long as you think

    While there is activity on both sides of the path, it’s only the (former) bowling green site that is being built on. The development on the larger site is on hold

    It will be interesting to see if/how much access to Redbraes Park (and then Broughton Road) is improved by locals

    At present it’s a moderately well used access by adventurous/agile people

    More problematic for people with bikes

    Of course this limited access option might be removed by ‘the authorities’

    Posted 1 month ago #
  17. chdot
    Admin

    Had a ‘tour’ yesterday

    Bridge/route finally ‘secure’ - chain and padlock on large gates at Broughton Road (could have been done weeks ago)

    Other end ‘secure enough’ unless anyone is desperate to stand on bridge

    Posted 1 month ago #
  18. chdot
    Admin

    Don’t think this has been mentioned on.CCE before


    Powderhall Junction A public conversation on the preferred layout.

    City of Edinburgh Council | September 2024

    https://storymaps.arcgis.com/stories/5095ece461fb4ddb89142ddb8e938f79

    Posted 2 weeks ago #
  19. chdot
    Admin

    By Councillor Caldwell for answer by the Convener of the Culture and Communities Committee at a meeting of the Council on 27 August 2026

    Does the Convener agree with me that the bridge leading between Broughton Road and St Mark’s Park is a key active travel link for the northeast of the city, affecting thousands of residents’ access to greenspace as well as a vital walking, wheeling and cycling route?

    https://democracy.edinburgh.gov.uk/documents/s102125/Item%2010.9%20-%20By%20Councillor%20Caldwell%20-St%20Marks%20Park%20Bridge%20Repair%20Prioritisation.pdf?ref=edinburghminute.com

    Posted 1 week ago #
  20. wingpig
    Member

    "A public conversation on the preferred layout."

    I'll have to dig around to see if I can find my saved opinions on that engagement. It wasn't apparent that the people who had created the layout had realised that there's a significant slope up to the junction at the end of McDonald Road and the usual thing about cyclists not being able to rotate around a vertical axis somewhere around their chainring to accommodate sharp right-angled turns on narrow channels.

    Posted 1 week ago #
  21. chdot
    Admin

    In theory a path could created from Broughton Road behind Powderhall Stables onto the bridge over the WoL and then join the NEPN paths. Another option would be via Redbraes Park In reality such joined-up-thinking might be ‘too difficult’…

    https://powderhall.link/2026/08/15/cec-writes-to-sg/

    Posted 1 week ago #
  22. chdot
    Admin

    Item no 10.9

    By Councillor Caldwell for answer by
    the Convener of the Culture and
    Communities Committee at a
    meeting of the Council on 27 August
    2026

    Does the Convener agree with me that the bridge leading
    between Broughton Road and St Mark’s Park is a key active
    travel link for the northeast of the city, affecting thousands of
    residents’ access to greenspace as well as a vital walking,
    wheeling and cycling route?

    While we do not hold data on the extent of use of the bridge
    at St Mark’s Park, it is acknowledged to be an important
    route for active travel and for access to and from the park.

    Acknowledging the seriousness of the inspection report, can
    the Convener confirm that bridge repair or replacement
    remains a top priority for the Parks Department?

    The Parks and Openspace team are working with the
    Structures team to understand the extent of the structural
    report. It is highly likely that a full bridge replacement will be
    required. This is a high priority. Officers are seeking cost
    estimates for full replacement. There is no current timetable
    for reopening.

    Is it envisioned that additional funding will be required to
    reopen the bridge? [/i]

    Additional funding will be required to install a new bridge.
    Officers are exploring cost estimates just now to inform
    budget decisions.

    Have other departments, such as the Active Travel
    department, been approached due to it being on Quiet
    Route 20 and neighbouring to CMP Project rank #9
    (Powderhall Junction)?

    All relevant departments are aware of this closure and the
    impact that it is having.

    Question (5) Answer (5) Is the Convener able to give an indicative timescale for re-
    opening?

    Officers will need to establish budget and undertake
    procurement of a new bridge. This is likely to take several
    months. Once tendered, the successful contractor will need
    to manufacture and install the bridge, which is likely to also
    take several months. Public utilities are understood to cross
    within the deck structure, and these will need to be diverted.
    If funding is not available until the new financial year, i.e.,
    April 2027, then realistically, a new bridge would not be
    installed and open until at least early 2028.

    Once approximate costs of a replacement structure are
    known, and funding has been identified, Officers will provide
    a written briefing to Transport and Environment members
    and Ward Councillors. This will outline a timetable for
    design, construction, and installation and intended to inform
    budget setting and allocation for 2027/28.

    https://democracy.edinburgh.gov.uk/documents/b28470/Questions%20and%20Answers%2027th-Aug-2026%2010.00%20City%20of%20Edinburgh%20Council.pdf?T=9

    Posted 2 hours ago #
  23. chdot
    Admin

    Not forgetting there IS an alternative

    In theory a path could created from Broughton Road behind Powderhall Stables onto the bridge over the WoL and then join the NEPN paths. Another option would be via Redbraes Park
    In reality such joined-up-thinking might be ‘too difficult’…

    https://powderhall.link/2026/08/15/cec-writes-to-sg/

    Posted 2 hours ago #