CityCyclingEdinburgh Forum » Infrastructure

Powderhall Bridge shut

(17 posts)

No tags yet.


  1. chdot
    Admin

    Until Dec 7th

    Posted 8 months ago #
  2. dessert rat
    Member

    local social media / curtain twitches are reporting that there's an application to close if for 2 years in the works - not sure I believe, but would be depressing if true - as a family we use this short link more than once / day and the alt routes are poor.

    Posted 8 months ago #
  3. wingpig
    Member

    When the consultation for this development was out years ago I questioned the need for the zone to include the north end of the path and was worried that it would end up with a load of placemaking hazards in the way. I do not recall any mention of any risk of it being shut for ages during development.

    Posted 8 months ago #
  4. neddie
    Member

    I once again iterated the importance of either minimising closure of the path itself, or opening a better diversion due to concerns about the length of diversion and suitability of the currently posted route for wheelchair users, prams, and cyclists as well as the impact on a nearby business.

    He confirmed that the team onsite are assessing options on the next door site (where the Stables are) to see if a parallel path is possible but was clear this was being explored so couldn’t be confirmed at this moment due to both health-and-safety considerations and liaison with the leads on that site

    https://www.broughtonspurtle.org.uk/news/st-marks-path-closure-latest-news

    Posted 8 months ago #
  5. chdot
    Admin

    After a community campaign, St Mark's Path will reopen today.

    According to The Edinburgh Minute Weekend edition: 19 - 21 December 2025

    https://www.edinburghminute.com/the-edinburgh-minute-weekend-edition-19-21-december-2025/

    Posted 7 months ago #
  6. gembo
    Member

    Maybe i divert that way then?

    Posted 7 months ago #
  7. chdot
    Admin

    And again (for different reasons)

    Full report -

    https://www.broughtonspurtle.org.uk/news/powderhall-bridge-closed

    Posted 1 month ago #
  8. chdot
    Admin

    (Yesterday)

    So

    Reinspected and declared safe?

    Didn’t mention before, but when the last Critical Mass went to St. Mark’s Park, there was a guy hanging about who said he was the engineer who had inspected the bridge and said it was unsafe and STRONGLY said that 100 bikes weren’t ‘allowed’ to cross the bridge

    CM organisers had already decided to alter route out of Park

    Posted 3 weeks ago #
  9. gembo
    Member

    Reinspected and things settled or reinspected after actual repair

    The bridge on the WoL path at the one hole golf course is closed. But this closure is ignored

    Posted 3 weeks ago #
  10. chdot
    Admin

    “reinspected after actual repair”

    Well suggestion was ’serious structural issues’ so assume not…

    Posted 3 weeks ago #
  11. bakky
    Member

    I'd say it's notable the barrier is still there (right of photo). If this was officially open again, they'd have removed the barrier from site?

    Posted 2 weeks ago #
  12. wingpig
    Member

    Does that bollard come out and to the wee vans which empty bins ever go across it?

    Posted 2 weeks ago #
  13. chdot
    Admin

  14. chdot
    Admin

  15. Yodhrin
    Member

    They could have the existing bridge knocked down and a temporary Bailey bridge in place inside a week while they look for a longer term solution, but I suspect nobody at the council is in any great hurry to do anything since they didn't want St Marks Path open during the construction on the adjacent site anyway and only reopened it on sufferance. Won't be surprised if, miraculously, any timescale they come up with for getting it sorted out will just so happen to coincide with the end of said construction works.

    Posted 1 week ago #
  16. chdot
    Admin

    “will just so happen to coincide with the end of said construction works”

    Well

    ‘Good’ news is that that may not be as long as you think

    While there is activity on both sides of the path, it’s only the (former) bowling green site that is being built on. The development on the larger site is on hold

    It will be interesting to see if/how much access to Redbraes Park (and then Broughton Road) is improved by locals

    At present it’s a moderately well used access by adventurous/agile people

    More problematic for people with bikes

    Of course this limited access option might be removed by ‘the authorities’

    Posted 1 week ago #
  17. chdot
    Admin

    Had a ‘tour’ yesterday

    Bridge/route finally ‘secure’ - chain and padlock on large gates at Broughton Road (could have been done weeks ago)

    Other end ‘secure enough’ unless anyone is desperate to stand on bridge

    Posted 5 days ago #